A developed urban building is available for sale, located on Rua Óscar da Silva and Rua D. Marcos da Cruz in Leça da Palmeira. The property is situated on a plot of land with a total area of 4,765 m², with a covered area of 3,450 m² and an uncovered area of 1,315 m². The building has two floors and a functional layout that allows for versatile use for commercial, logistics, and service activities. On the ground floor, at the front of the building, there are three spaces intended for commercial shops, suitable for commerce and services. These spaces are connected to administrative and support areas, allowing for integrated use between the commercial and operational areas. Shop 1 Independent exterior entrance; Connection to the 1st floor via stairs; Access to two public restrooms; Direct connection to the rear warehouse area; Office space. Shop 2 Independent exterior entrance; Direct connection to the warehouse at the rear; Internal connection to Shop 3; Office space. Shop 3 Independent exterior entrance; Direct connection to the warehouse; Internal connection to Shop 2; Includes office space. Also on the ground floor, at the rear of the building, are the technical assistance services. This area is functionally organized, comprising three distinct warehouses, four technical zones separated by removable walls, allowing for high flexibility in space reorganization, and a technical corridor that ensures direct access to the warehouses and shops. There is also a logistics area, areas for stock and spare parts, a leisure area with a canteen, as well as two bathrooms and common support areas. The warehouses have direct access to the shops and administrative area, facilitating the operational management of the property. Ground Floor – Rear Area (Warehouses and Technical Areas) 3 warehouses with independent entrances, allowing autonomous operations; Warehouses with direct access to shops and offices, facilitating logistics and administrative operations; 4 technical areas, divided by removable walls, allowing high flexibility in adapting the spaces; A technical corridor provides functional access to the warehouses and shops; Dedicated logistics area; Stock and spare parts area; Leisure/canteen area; 2 bathrooms and common support areas. The first floor is entirely dedicated to the administrative and office component, comprising twenty offices, three meeting rooms, a training roo